Work at Heights Permit
Registration Form

About this form
It is prohibited to do any building or maintenance work in PMNSW building elements containing ACM or where it is presumed to be present, without formal written approval by PMNSW Authorised Representative.
  • Applications to be submitted a minimum of 7 working days excluding weekends and public holidays prior to the proposed work date. All documentation must be submitted with this application or the application may not be assessed.
  • Approval requires the following criteria to be met and information provided to the PMNSW Representative along with a Safe Work Method Statement prior to work commencement.
  • The permit is only valid for the time specified on the permit.
  • A copy of this permit must be carried and produced upon request.
How to complete this form
  1. Ensure that all fields have been filled out correctly.
  2. Please note that all fields on this form are mandatory and must be completed before submitting the application.
  3. Once completed this form is to be submitted online.
  4. Documents must use .pdf format and have a filename that does not exceed 255 characters.
Please nominate which category your permit application relates to from the selection below:


Location

Section A - Application Details

Section B

Section C - Lodgement Details

Please note: Incomplete forms will not be processed until all information has been provided.




APPLICATIONS WILL BE PROCESSED WITHIN SEVEN (7) WORKING DAYS OF RECEIPT
 : 
 : 
Safety Checklist-Contractor to complete
Ladders
Rails, rungs, steps, ropes, stays, braces, hinges and feet all checked and OK
Roofs
Crawling boards in place
Safety harness used
Perimeter protection in place
Scaffolding
Designed constructed and examined in accordance with statutory regulations
Copy of examination report held
Fall restraint/arrest
Used above 3 metres
Inspected and checked prior to use
Secured to correct anchor points
Persons trained in use
Elevated work platform
Positioned in a safe stable manner
Persons operating equipment have necessary tickets or permits
Ensure work is carried out in such a manner that it would not endanger people or cause damage to the equipment/building
Are cordoned off with warning signs/ribbon/tape
Maintain good housekeeping at all times
Debris generated disposed off from site immediately

Fees
For works contracted by PMNSW or CBRE fees may be waived, please complete this section as required and fees will be assessed pre approval.
Application fee
$133.00

These fees are exempt from GST as Division 81 Fees & Charges.

SECTION D - DOCUMENTS

*Only Accept Adobe Acrobat Document (.pdf)

*Only Accept Adobe Acrobat Document (.pdf)

*Only Accept Adobe Acrobat Document (.pdf)

Acknowledgement of Application

DECLARATION*